520 NE Glen Oak Avenue, Peoria, IL 61637

  • Architect: PSA Dewberry
  • General Contractor: Pepper Construction

Recently, Kelso-Burnett Co. completed a data center and office build-out project for Old Saint Francis Medical Center in Peoria, Illinois. The project consisted of installing cable to 48 cabinets using state of the art pre-terminated fiber optic and enhanced Category 6 cabling assemblies in a hot aisle containment setting including seismic bracing of all cabinets. Kelso-Burnett Co. also performed structured cabling to 2000 workstations on three floors, as well as installed fiber optic cabling and a copper backbone.